Radiator assembly line, capacity of 5000 pcs/month (Technical supply specification)


1. Main Technical Specifications and Scope of Supply

The radiator assembly line is designed for assembling radiators from pre-fabricated components, utilizing both manual and automated operations.

The production volume is 5,000 pieces per month, based on a 5-day workweek with 8-hour shifts. The assembly cycle time per radiator must not exceed 2 minutes.

Each sub-assembly station must be equipped with a buffer storage capacity for 1 full shift (240 units).

Scope of supply for assembly:

  • Lada Granta A/C radiator (Part No. POAR 3221.003) – 1 pc.
  • Radiator electric fan (Part No. 459000334) – 1 pc.
  • Hose assembly with mounting brackets – 3 pcs.
  • Cooling radiator – 1 pc.
  • Fastener kit
Radiator assembly line general arrangement drawing (top view)
Radiator assembly line general arrangement drawing (top view)

2. Radiator Assembly Line Structure

  • Lada Granta A/C radiator sub-assembly station (Part No. POAR 3221.003)
  • Radiator electric fan sub-assembly station (Part No. 459000334)
  • Hose sub-assembly and kitting station
  • Final assembly station for “Radiator” unit
  • Logistics and transport system

2.1 Lada Granta A/C Radiator Sub-Assembly Station (Part No. POAR 3221.003)

The sub-assembly station is shown in Figure 1.

Lada Granta A/C radiator sub-assembly station (Part No. POAR 3221.003)
Lada Granta A/C radiator sub-assembly station (Part No. POAR 3221.003)

The station consists of:

  1. Loading area for A/C radiator trolleys
  2. Unloading area for empty trolleys
  3. Automatic tape cutting machine (cut-to-length)
  4. Storage bin for cut tape
  5. Cooling radiator assembly bench
  6. Storage bin for studs and plugs
  7. Buffer storage for assembled A/C radiators for 1 shift (240 pcs.), shown in Figure 1A

The A/C radiator assembly bench must be equipped with a cordless screwdriver for stud installation and an air supply line. A tablet displaying the assembly sequence and a finished product template must be mounted above the bench. The area must be illuminated.

Buffer storage system for 240 A/C radiators (1 working shift)
Buffer storage system for 240 A/C radiators (1 working shift)

The general view and technical specifications of the tape cutting machine are detailed below:

Tape Cutting Machine
Tape Cutting Machine

Technical Specifications of the Tape Cutting Machine

ParameterValue
Cut typeStraight cut
Cutting methodCold cut (sharp blade)
Blade width100 mm
Maximum tube diameter15 mm
Cut length range3 ~ 999,999 mm
Output capacity~ 120 pcs/min
Voltage220 V
Additional functionalityControl panel in Russian, batch cutting setup
Operations manualYes
Remote technical supportYes
Dimensions750 × 310 × 410 mm
Weight30 kg
Warranty period1 year
Typical applicationsTube cutting, rubber profiles, rubber seals, silicone seals, heat-shrink tubing

2.2 Radiator Electric Fan Sub-Assembly Station (Part No. 459000334)

The sub-assembly station is shown in Figure 2.

Radiator electric fan sub-assembly station
Radiator electric fan sub-assembly station

The station consists of:

  1. Loading area for electric fan trolleys
  2. Unloading area for empty trolleys
  3. Automatic tape cutting machine (cut-to-length)
  4. Storage bin for cut tape
  5. Cooling electric fan assembly bench
  6. Storage bin for anti-vibration mounts and captive nuts
  7. Buffer storage for 240 radiator electric fans, shown in Figure 2A

A tablet displaying the assembly sequence and a finished product template must be mounted above the bench. The area must be illuminated.

The tape cutting machine is identical to the machine used at the A/C radiator sub-assembly station.

Buffer storage system for 240 radiator electric fans
Buffer storage system for 240 radiator electric fans

2.3 Hose Sub-Assembly and Kitting Station

The sub-assembly station is shown in Figure 3.

Hose sub-assembly and kitting station
Hose sub-assembly and kitting station

The station consists of:

  1. Loading area for hose trolleys with a scissor lift table
  2. Unloading area for empty trolleys
  3. Automatic hot-knife sleeve cutting machine (cut-and-seal)
  4. Storage bin for cut sleeving
  5. Pneumatic tool for sleeve installation onto the hose
  6. Assembly bench for packing the hose kit into a plastic transit container
  7. Buffer storage for 240 hose kits, shown in Figure 3A

A tablet displaying the assembly and kitting sequence, along with a finished kit template, must be mounted above the bench. The area must be illuminated.

Buffer storage system for 240 hose kits (1 working shift)
Buffer storage system for 240 hose kits (1 working shift)

The hose installation kit is packed into a plastic transit container and routed to the final assembly station.

The general view and technical specifications of the hot-knife sleeve cutting machine are detailed below. The pneumatic tool for sleeve installation requires custom engineering.

Hot-Knife Sleeve Cutting Machine
Hot-Knife Sleeve Cutting Machine
ParameterValue
Cut typeStraight cut
Cutting methodHot cut (wire)
Blade width150 mm
Cut length range50 ~ 300,000 mm
Output capacity~ 26 pcs/min
Voltage220 V
Operations manual in RussianYes
Remote technical supportYes
Dimensions830 × 560 × 760 mm
Weight87 kg
Warranty period1 year
Typical applicationsSleeve cutting, sleeving, cable sleeving

2.4 Final Assembly Station for “Radiator” Unit

This station consists of four identical assembly work cells. The dimensions of each work cell are 2,800 mm × 3,800 mm, as shown in Figure 4.

Final assembly station for "Radiator" unit
Final assembly station for “Radiator” unit

The station consists of:

  1. Lift for component feeding to the final assembly area
  2. Assembly bench equipped with the required tools, as well as final product testing equipment (if required)
  3. Loading area for cooling radiator trolleys
  4. Unloading area for empty trolleys

A tablet displaying the assembly and kitting sequence, along with a finished product template, must be mounted above the bench. The area must be illuminated.

2.5 Logistics and Transport System

The transport system for the “Radiator” assembly area operates on a closed-loop semi-automatic cycle.

The core logistical principle relies on assembling the final “Radiator” unit on a dedicated fixture, as shown in Figure 5. The fixture consists of a plate equipped with V-blocks, stops, and clamps to ensure the correct spatial orientation of the components during assembly (preventing assembly errors). The fixture is also fitted with transport clamps to secure the sub-assemblies at each station for delivery to the final assembly area.

Transport System Description:

  1. An empty assembly fixture is loaded onto the conveyor and fed into the hose kitting station area.
  2. At the hose station, the operator mounts the assembled kit into a dedicated position on the fixture intended for the hose tray. The fixture then proceeds via the same transport system to the electric fan shroud installation area.
  3. At the electric fan shroud assembly station, the operator mounts the assembled electric fan into a designated position on the fixture. The fixture then moves via the same transport system to the A/C radiator installation area.
  4. At the A/C radiator assembly station, the operator mounts the assembled radiator into a designated position on the fixture. The fixture with the pre-assembled components is then routed via the transport system to the main assembly area.
  5. The shop floor includes a 2-meter-wide aisle for supplying condenser trolleys to the main assembly area. Therefore, after components are loaded from the sub-assembly stations, a vertical lift raises the fixture to clear the aisle.
  6. From the overhead conveyor, an automated distribution system routes the fixtures with the components to the lifts of the four assembly work cells. The lift lowers the fixture into the assembly work cell, and a pusher advances it onto the assembly bench, where the operator assembles and tests the finished “Radiator” unit.
  7. Upon completion of the assembly, the operator uses a pusher to transfer the “Radiator” on its fixture—along with the hose kitting container mounted on it—onto the finished goods conveyor heading to the packaging area.
  8. The finished goods conveyor delivers the “Radiator” to the packaging area. The packer removes the “Radiator” from the fixture for packaging, and also removes the hose kitting container to place it on a utility trolley or returns it to the assembly station on the fixture via the lift-and-conveyor system.
  9. The trolley with the accumulated empty containers is sent back to the hose kitting station.
  10. The empty fixture is routed back to the component loading area via the closed-loop transport system.
Final assembly of the "Radiator" unit on the fixture
Final assembly of the “Radiator” unit on the fixture

About

Radiator Assembly Line: Engineering Solutions for a Production Capacity of 5,000 Kits per Month

Imagine a modern manufacturing plant where more than twenty finished automotive radiators roll off the line every hour. Components flow from various sub-assembly stations—A/C radiators, electric fans, hoses, and fasteners. All these must be assembled into a single unit with millimeter precision to ensure the cooling system operates flawlessly. Now consider the constraints: the assembly cycle time per radiator must not exceed two minutes, and the production volume is 5,000 units per month. A conventional conveyor system cannot handle such a task.

When Standard Approaches Fail

Radiator assembly is a process demanding both high speed and absolute precision. The human factor is the main challenge: hoses can be mismatched, studs undertorqued, or components delayed in delivery. Furthermore, each sub-assembly station must maintain a buffer storage capacity for a full shift—amounting to 240 units. Without well-engineered logistics, operational chaos follows: trolleys conflict, components get misplaced, and workers experience downtime. While manual assembly is too slow, full automation requires multi-million investments. A precise balance must be found.

Technical Solution for Smart Manufacturing

Izhora Hydrosystems engineers have designed a radiator assembly line that combines automation of critical operations with engineered ergonomics for manual tasks. The system layout is divided into five functional areas: A/C radiator sub-assembly, electric fan sub-assembly, hose sub-assembly, final assembly, and a closed-loop transport system.

The A/C radiator sub-assembly station is equipped with an automatic tape cutting machine, while the assembly bench features a cordless screwdriver and an air supply line. A tablet displaying the assembly sequence and a finished product template is mounted above each bench. The same operational logic applies to the fan and hose stations. For the hose station, a custom pneumatic sleeve installation tool was engineered; while this is the only node requiring specialized custom design, it entirely eliminates defects when fitting protective sleeving onto the hoses.

The core innovation lies in the fixture-driven transport system. Instead of disorganized trolley movement, a closed-loop semi-automatic cycle is utilized. The assembly fixture is a plate fitted with V-blocks and clamps that hold components in a strictly defined position throughout the entire assembly process. The empty fixture moves sequentially through all stations, collecting components before arriving at the final assembly stage. To ensure clear passage for condenser trolleys, a vertical lift elevates the fixtures overhead.

Final assembly is distributed across four identical work cells. A lift lowers the fixture onto the bench, a pneumatic pusher positions it, and the operator assembles the finished radiator within minutes. After final inspection, the product is routed to the packaging area, and the empty fixture returns to the beginning of the cycle.

Key Figures and Facts

The radiator assembly line is engineered for a 5-day workweek with 8-hour shifts. The assembly cycle time is a maximum of two minutes per radiator. Each buffer storage unit holds 240 components—exactly one full shift of inventory. The scope of supply includes automatic cutting machines for tape, foam, and hot-knife sleeving, over 100 fixtures and containers, pneumatic pushers, roller guides, conveyors, and a control system with proprietary software. All work cells are illuminated to industrial standards, and instruction tablets eliminate operational errors.

Practical Value

The developed radiator assembly line satisfies the primary objective: ensuring a stable output of 5,000 units per month with high quality and minimal human error. The semi-automatic fixture-driven transport system eliminates orientation errors and reduces logistics handling time, while the buffer storage units at each station guarantee uninterrupted operation even during temporary component supply delays.

For the Russian manufacturing sector, this equipment represents a step toward technological independence. The manufacturer — Izhora Hydrosystems — provides a 12-month warranty, supervised installation, and commissioning. Amid sanctions and the requirement for import substitution, such solutions enable plants to maintain stable and rhythmic production without relying on foreign suppliers. This is a radiator assembly line engineered to deliver results.


3. Scope of Supply

3.1. Radiator Assembly Line

Parameter / DescriptionQuantity
Hose station
Containers100 pcs.
Sleeve cutting machine1 pc.
Buffer storage:
    Heavy-duty aluminum structural profile 60×60, uncoated400 pcs.
    Aluminum roller tracks D32 (2 meters)110 pcs.
    Pneumatic pusher assembly: 4 cylinders, manifold, aluminum pusher, position sensors12 pcs.
    Fittings and fasteners4 lots
Sleeve installation tool (pneumatic)1 pc.
Assembly bench with illumination and tool drawers1 pc.
Radiator electric fan sub-assembly station
Foam cutting machine1 pc.
Buffer storage:
    Steel angle St30.5 lot
    Aluminum roller tracks D32 (2 meters)72 pcs.
    Cylinder-actuated gate valve + pusher12 pcs.
    Fittings and fasteners3 lots
Assembly bench1 pc.
A/C radiator sub-assembly station
Foam cutting machine1 pc.
Buffer storage:
    Steel angle St30.6 lot
    Aluminum roller tracks D32 (2 meters)54 pcs.
    Pneumatic pusher assembly: cylinder-actuated gate valve + manifold12 pcs.
    Fittings and fasteners3 lots
Assembly bench1 pc.
Logistics and transport system
Conveyor No. 1
    Heavy-duty aluminum structural profile 60×60, uncoated120 pcs.
    Timing belt, metric profile 8M, width: 50 mm, length: 2000 mm, Sati 20008M5018 pcs.
    Drive pulleys36 pcs.
    Roller brackets352 pcs.
    Rollers176 pcs.
    Fasteners1 lot
    Gearbox1 pc.
Conveyor No. 2
    Heavy-duty aluminum structural profile 60×60, uncoated120 pcs.
    Timing belt, metric profile 8M, width: 50 mm, length: 2000 mm, Sati 20008M5018 pcs.
    Drive pulleys36 pcs.
    Roller brackets352 pcs.
    Rollers176 pcs.
    Fasteners1 lot
    Gearbox1 pc.
Vertical lift conveyor (Lift 1)
    Heavy-duty aluminum structural profile 60×60, uncoated30 pcs.
    Lift guide rails16 pcs.
    Carriages8 pcs.
    Lift platform with brackets1 pc.
    Chain10 pcs.
    Sprockets2 pcs.
    Machined parts and hardware1 lot
    Gearbox1 pc.
Vertical lift conveyor (Lift 2)
    Heavy-duty aluminum structural profile 60×60, uncoated30 pcs.
    Lift guide rails16 pcs.
    Carriages8 pcs.
    Lift platform with brackets1 pc.
    Chain10 pcs.
    Sprockets2 pcs.
    Machined parts and hardware1 lot
    Gearbox1 pc.
Vertical lift conveyors (Lifts)6 pcs.
Overhead conveyors (above the aisle)2 pcs.
Overhead horizontal conveyor with pushers1 pc.
Assembly benches 1, 2, 3, 44 pcs.
Finished goods conveyor1 pc.
Assembly fixtures100 pcs.
Control system with software1 set

4. Manufacturer

Izhora Hydrosystems LLC


5. Warranty Period

12 months from the date of shipment, unless otherwise provided by the contract.