Stern A-frame launch and recovery system (LARS), SWL 2 t (Technical supply specification)


1. General Data (Operating Conditions)

The A-frame LARS operates reliably under the following marine environmental conditions:

  • Design ambient air temperature: +25 °C with 80% humidity in summer; −30 °C with wind speed up to 25 m/s (hull structure design temperature: −40 °C) with 85% humidity in winter; water temperature ranges from +32 °C to −2 °C respectively;
  • Shipboard vibration;
  • Periodic seawater splashing of components;
  • Machinery installed in enclosed spaces remains fully operational at ambient air temperatures up to +45 °C;
  • Sea state up to 3.

2. Purpose

The A-frame LARS is designed for lifting operations.

A-frame LARS, SWL 2 t – General arrangement, side view
A-frame LARS, SWL 2 t – General arrangement, side view

About

Extreme Aft Deck Environments

Consider the aft deck of a research vessel, where operations demand maximum speed and safety. With a sea state building on the horizon, ambient temperatures shifting between −30 °C and +25 °C, and a 2-tonne load to retrieve, standard lifting appliances risk downtime or component failure. The A-frame LARS by Izhora Hydrosystems operates flawlessly under these conditions.

Limitations of Standard Equipment

Marine environments impose unique demands on lifting appliances. Hull vibration, persistent seawater spraying, sea states up to 3, and operations at up to 10° heel and 2° trim will compromise standard frames. Conventional systems often require dedicated machinery spaces, face ambient temperature constraints, or compromise safety during high-load outreach operations. Historically, domestic shipbuilders relied on imported equipment, driving up project lead times and procurement costs.

Marine Engineering Solution

The A-frame LARS is specifically engineered for offshore environments. The welded steel structure withstands shipboard heel and vibration, while hydraulic cylinders equipped with counterbalance valves and end-of-stroke sensors ensure precise outreach control. A hydraulic power unit (HPU) operating at pressures up to 240 bar, a portable HPU in a splashproof enclosure, and a control system with dual control panels enable safe, efficient lifting operations from any deck location.

Protection and Versatility

Equipment versatility and environmental protection are core design features. IP56 ingress protection secures all open-deck electrical components, materials resist temperature fluctuations from −30 °C to +40 °C, and the coating system and preservation coatings allow storage for 12–18 months without performance degradation. Power supply cables feature mating connectors, and the complete scope of supply includes all necessary fasteners and cable glands for streamlined installation.

Performance Data and Capabilities

The A-frame features an SWL of 2 tonnes with overall dimensions of 8×8 m and a 6 m outreach beyond the stern roller. Factory acceptance tests (FAT) and RMRS certification confirm compliance for operations down to −40 °C. Floodlights, control cabinets, and HPUs are fully protected against moisture and marine salinity, enabling 24/7 operations in all weather conditions. The comprehensive scope of supply includes a 3-year spare parts kit (SPIR) to ensure long-term operation without downtime.

Reliability and Design Integrity

The A-frame LARS delivers a robust solution for domestic vessels to execute complex lifting operations without risk of mechanical failure or delay. From hydraulics to coating systems, and from the portable HPU to optimized marking and packaging, every component is engineered for maximum performance in marine environments. This design philosophy ensures crew safety, minimizes downtime, and guarantees predictable load handling under the most severe conditions.


3. Scope of Supply

3.1 Stern A-Frame LARS

3.1.1 System Components

ComponentQuantity
Welded steel lifting A-frame1
Maintenance platform with rungs (interconnecting bridge between vertical legs)1
Control cabinet, IP56 portable control panel, and IP56 fixed control panel with Russian interface1
Outreach hydraulic cylinders complete with counterbalance valves and end-of-stroke sensors2
Wide-sheave block with sealed rolling-element bearings, foundations, and pins1
Hydraulic hoses and adapters1 set
Outdoor lighting fixtures (floodlights)1 set
Corrosion-resistant identification plate1
Set of fasteners and cable glands1 set
Russian-language labels and plates1 set
Portable HPU in a splashproof enclosure for open-deck installation1
Spare parts kit1
П-образная рама СПУ грузоподъемность 2т габаритный чертеж вид сверху
A-frame LARS, SWL 2 t – General arrangement, top view

3.1.2 Main Parameters

ParameterValue
Model typeStern lifting A-frame
Sheave block capacity (SWL)2 t
Dimensions (W×H)8×8 m
Outreach beyond stern roller6 m
Operating heel / trim angles10° heel and 2° trim
Sea state (Beaufort scale)3
Wind load400 Pa
Power supply400 V AC / 50 Hz / 3-phase
Operating temperature−30 °C to +40 °C
Winterizationized layout temperature−40 °C
Rated pressure210–240 bar
A-frame color (coating system)To be clarified after contract award
TestingFactory acceptance tests (FAT)
HPU operating pressure240 bar
Control systemIntegrated with hydraulic tank

3.1.3 Spare Parts Kit

Standard OEM spare parts kit (SPIR) for 3-year operation — 1 set.

3.1.4 Documentation

DocumentQuantity
Equipment passport1
Installation manual1
Operating manual1
List of spare parts1
Factory acceptance test report1
Shipboard test procedure1

3.1.5 Certificates

The equipment is supplied with an RMRS certificate under Form 6.5.30 — 1 copy.

A-frame LARS, SWL 2 t – General arrangement, front view
A-frame LARS, SWL 2 t – General arrangement, front view

4. Additional Requirements

  • All electrical equipment installed on the open deck features an IP56 protection rating.
  • All materials resist operating temperature ranges from −30 °C to +40 °C.
  • Coating system: the coating system scheme and color are subject to Customer approval.
  • Preservation coatings ensure an indoor storage life of 12–18 months.
  • Hydraulic system operating fluid: AUP hydraulic oil.
  • Hydraulic fluid cleanliness class according to GOST 17216-71: minimum Class 12.
  • The A-frame LARS complies with the General Regulations for Technical Supervision of the Russian Maritime Register of Shipping (RMRS) Rules and is supplied with corresponding documentation.
  • The equipment is supplied with RMRS documentation confirming operational capability at temperatures down to −30 °C without auxiliary heating.
  • Electromagnetic compatibility (EMC) with other shipboard equipment complies with RMRS Rules.
  • Auxiliary power supply for electrical equipment (control panels, space heaters): 230 V / 50 Hz.
  • Power supply cables feature mating connectors.
  • All electrical equipment features external grounding bolts and cable glands.
  • The complete scope of supply includes all necessary fasteners (bolts, nuts, washers, etc.).
  • Mating connections (counter-flanges) for shipboard piping systems are included in the scope of supply.
  • Labels and plates are provided in both English and Russian (for domestic equipment, Russian language only is permitted).
  • Equipment packaging enables handling via both crane and forklift, transport by road, and storage in sheltered outdoor areas.
  • Equipment and component marking includes references to the corresponding item numbers of the contract specification and matches the packing lists.

5. Manufacturer

Izhora Hydrosystems LLC


6. Warranty Period

12 months from the date of shipment, unless otherwise specified in the contract.